Services · Design and selections

Kitchen and bathroom design services in Chicago.

Design is the first half of every remodel we build and it is done by the same team that prices and builds it. It starts with render previews from your photos, runs through measured drawings, elevations and material selections, and ends in a written scope and a priced proposal. This page explains what the design work includes, how selections are organized so nothing is chosen twice, and how it fits a kitchen or bathroom remodel near Chicago.

View from a white oak kitchen through a wide cased opening into a dining room with arched built-in shelving

At a glance

What design means for cost and time.

Design is included in a complete remodel with Lakefront Interiors rather than sold separately: a kitchen typically falls between $40,000 and $125,000 before selections and a bathroom between $35,000 and $100,000, and the drawings, renders and selection work are part of that. Kitchen design and decisions typically take four to eight weeks from the in-home consultation to a signed proposal; a bathroom takes three to six weeks.

The pace is set by how quickly the layout, cabinetry, appliances and surfaces are decided, and clients who arrive with photos, a budget band and a short list of must-haves move through it fastest. The figures are planning guidance as of September 2026, not a quote.

How we work

Designed by the people who will build it.

In a typical project a designer draws the room, a contractor prices it, and the homeowner sits between them when the drawing and the price disagree. Here the same team does both, so every layout option comes with what it would cost, and every selection is checked against the drawings before it is ordered. The design is done when there is a set of drawings a crew can build from and a proposal with a number on it.

Selections are organized so each decision narrows the next: layout before cabinetry, cabinetry before surfaces, surfaces before hardware, lighting and paint. Samples come to your home and are looked at in your room’s light. Where a client wants an interior designer or architect involved, we work alongside them; where a client already has finished construction drawings from someone else and only needs them built, we are not the right fit.

On its own? We do not sell drawings or a design package on their own for another contractor to build. Design here is the first half of a remodel we go on to price and build.

What is included

What the design work covers.

From the first preview to the signed proposal.

  1. 01

    Render previews from your photos

    Include photos with your inquiry and you receive complimentary render previews within minutes, a way to test a direction before anyone has measured anything. They are a starting point for the conversation, not a design.

  2. 02

    Field measurement

    At the in-home consultation the room, doors, windows, ceiling heights, plumbing, panel and structure are measured and photographed. Everything after this is drawn from those measurements.

  3. 03

    Layout options

    Two or three layouts with the tradeoffs of each written down, including what each would cost. Keeping the footprint against changing it is usually the first decision, and it is made on paper.

  4. 04

    Elevations and details

    An elevation for every cabinet run, tiled wall and vanity wall, with the lighting, outlets and appliances on it, and sections where heights and transitions matter.

  5. 05

    Material selections

    Cabinet finish, countertop, tile, flooring, fixtures, hardware, lighting and paint, chosen in order and recorded in a selections schedule with model numbers, so the proposal and the order match.

  6. 06

    Renders, scope and proposal

    Detailed renders of the chosen design, a written scope that lists what is and is not included, and a priced proposal to review together. Allowances are stated plainly where a selection is still open.

Decision aid

Design-build or designer plus contractor?

Both can produce a good kitchen. The difference is who carries the risk when the drawing and the price disagree.

Scroll the table sideways to see every column.

Design-build or designer plus contractor?
AspectDesign-build (this)Separate designer and contractor
Who prices the designThe team that drew it, as it is drawnA contractor, after the design is done
When cost is knownWith each layout optionAfter bids, sometimes after redesign
SelectionsChecked against the drawings before orderingPassed between parties; gaps show on site
Changes during constructionPriced by the people who know the drawingNegotiated between designer, contractor and you
Your roleDecide; one point of contactCoordinate; two contracts
Best whenYou want one accountable team and a known number earlyYou have a designer you love, or a very unusual project

In the four stages

Where design sits in the schedule.

Design is stages one and two of the four. Nothing is ordered until it ends in a signed proposal.

  1. 01

    Inquiry and previews

    You describe the project and, if you like, include photos. Render previews arrive within minutes and a call follows.

  2. 02

    In-home consultation

    The room is measured and the plumbing, electrical and structure are checked. We discuss what you want, what the house allows and the budget band.

  3. 03

    Layout and elevations

    Layout options with costs, then elevations for the chosen one, reviewed with you and revised.

  4. 04

    Selections

    Materials chosen in order, sampled in your home, recorded with model numbers.

  5. 05

    Proposal

    Renders, a written scope and a priced proposal. When it is signed, ordering and permits begin.

Cost and schedule

What moves the design timeline.

Design time is mostly decision time. These are what lengthen or shorten it.

How settled you are
Clients with photos, a budget band and a short must-have list move through design in weeks; open-ended briefs take longer.
Layout change
A changed footprint means more options, more drawing and sometimes an engineer.
Selections pace
Each open selection holds the proposal; a selections schedule with dates keeps it moving.
Condominium review
Association approval of the drawings adds weeks that are outside anyone’s control.
Custom cabinetry
Custom shops need finished elevations before they quote, which puts more drawing before the number.
Other professionals
Working with your architect or designer adds coordination and often improves the result.

Chicago

Designing for Chicago homes.

The design starts from the building. A bungalow kitchen, a two-flat, a vintage courtyard condo and a lakefront high-rise each have a first question that has to be answered before the layout is drawn: which wall is load-bearing, where the stack is, what the association allows, whether the panel has room. The consultation is built around finding those answers, and the layout options are drawn inside them, which is why the proposal rarely changes once construction starts.

Design also has to respect the house. Original casings, oak floors and plaster arches in a Chicago house are worth keeping, and the drawings show how the new kitchen meets them. In the North Shore and western suburbs the question is more often how an open kitchen relates to the family room and the yard, and the drawings show that relationship from both sides.

Bathroom with a floating white oak double vanity, two arched mirrors with sconces and a glass-enclosed tiled shower
A double vanity wall with two mirrors and sconces, and the shower glass beside it. One elevation carries the vanity, the mirrors, the lighting and the glass line.

Recent work

Recent projects that show this work.

Completed by the contractors on our team and labeled with the location and the contractor.

See all recent work

Questions

Common questions about kitchen and bathroom design.

Is there a design fee?

Design is part of a complete remodel with us rather than a separate service. The render previews from your photos are complimentary, the in-home consultation follows, and the design work leads to a priced proposal for the project.

Can I work with my own interior designer or architect?

Yes. We work alongside designers and architects on a regular basis and coordinate the drawings with them. If you already have finished construction drawings and only need a builder, we are not the right fit.

What are the render previews?

Renders generated from the photos you include with your inquiry, delivered within minutes, to test a direction before the visit. They are a conversation starter; the design itself comes from measurements.

How many layout options do I get?

Usually two or three, each with its tradeoffs and cost written down. More than that tends to slow the decision rather than improve it.