What does a bathroom remodel cost in Chicago?

A bathroom is small enough that its cost is easy to underestimate. Nearly every trade in the house works inside it, and most of the budget ends up behind the tile.

Author
By Lakefront Interiors
Published
Reading time
8 minute read
Narrow bathroom with a travertine soaking tub under a steel window, a floating oak vanity and a reeded glass shower

The short answer

Most complete bathroom remodels Lakefront Interiors takes on in Chicago fall between $35,000 and $100,000 before selections. A hall bathroom rebuilt in its existing layout sits toward the lower end; a primary bathroom with a new layout, a curbless shower and a freestanding tub sits toward the upper end. Nationally, homeowners reported a median of $22,000 for a major bathroom remodel in the 2025 Houzz study, a figure that spans every scope and kind of contractor. Your own number follows the in-home visit.

The planning range, and where a bathroom sits in it

Our range describes complete remodels: the room taken back to the studs or close to it, with new plumbing and electrical work behind new waterproofing, tile, a vanity, fixtures, glass, lighting and ventilation. Within that range, a handful of decisions sort one bathroom from another, and the layout and the shower do most of the sorting.

Scroll the table sideways to see every column.

What moves a complete bathroom remodel within the planning range
AspectToward $35,000Toward $100,000
LayoutToilet, vanity and shower or tub stay where they areFixtures move, and drains are rerouted through the floor
ShowerA curbed shower pan or a tub with a tiled surroundA curbless shower with a recessed pan, a linear drain and large glass panels, or a wet room
TileTile in the wet areas, painted walls elsewhereTile to the ceiling, large-format slabs or a patterned floor
Vanity and fixturesA semi-custom vanity and standard fixturesA custom vanity, an integrated stone sink and wall-mounted faucets
Comfort and lightA properly sized exhaust fan and good lighting at the mirrorA heated floor, a lit mirror, light in the shower and a new exhaust route
What the walls holdA sound subfloor and drains in good conditionA softened subfloor, a cast-iron stack or galvanized supply lines replaced

Tendencies for Lakefront Interiors bathroom projects in Chicago and the suburbs as of September 2026, before selections. Most bathrooms mix both columns, and the proposal after the visit prices your room.

A national benchmark, and why it reads lower

Three things separate a national median from a Chicago proposal for a complete remodel. The first is scope: a median includes projects that keep the old tub, the wall tile or the plumbing, while a complete remodel replaces them. The second is the building: bungalows, two-flats and vintage condominiums bring cast-iron drains, galvanized supply lines and concrete floors that a newer house does not. The third is coordination: permits, inspections and, in a condominium, association approvals and shutoff scheduling take time, and time appears in the price.

What older Chicago buildings add

  • Cast-iron drain stacks and galvanized supply lines near the end of their life, replaced while the walls are open rather than after a leak.
  • Plaster and lath walls, which make for heavier demolition than drywall and are rebuilt with cement board in the wet areas.
  • Floors that are out of level or softened under an old tub, repaired before a shower pan or tile can go down.
  • Rooms that have never had an exhaust fan ducted outside, where a new route through a wall or the roof has to be created.
  • In high-rise condominiums, concrete slabs that cannot be trenched for a new drain, and building rules on materials, shutoff valves and inspections by the building engineer.

What a budget under $35,000 usually means

The bathroom budget bands in our inquiry form begin at $20,000, because a budget is a starting point for the conversation rather than a test. Budgets below the planning range are most realistic where a bathroom keeps its layout and much of its plumbing, or where the room itself is small. Partial jobs such as a fixture swap, regrouting or refinishing are not work we take on, and the visit tells you plainly whether a complete remodel of your room fits the number you have in mind.

How cost and schedule move together

The decisions that raise a bathroom's cost usually lengthen its construction as well. A bathroom that keeps its layout typically takes three to five weeks from demolition to the final walkthrough; moving fixtures or recessing a pan for a curbless shower typically takes five to eight. Shower glass is measured only after the tile is finished, which puts two to three weeks between the template and the installation whatever the budget.

How to compare bathroom proposals

  • Waterproofing named as a system: the membrane, the pan, how niches and benches are sealed, and whether the shower is flood-tested before tile.
  • The plumbing scope in plain terms: which drains and supply lines are replaced, not only which fixtures are installed.
  • Tile extent: which walls are tiled, to what height, and who supplies the tile.
  • The vanity, fixtures and glass as named selections or clearly stated allowances.
  • Ventilation: the fan's capacity and where its duct actually goes.
  • Permits, inspections and, in a condominium, the association's requirements.

How we price a bathroom

Bathroom pricing follows the in-home consultation. We measure the room, find the drain, vent and supply lines, check the floor structure under the shower and the capacity of the electrical panel, and read the building's remodeling rules where there are any. The proposal names the selections and the work behind the tile, so two bathrooms of the same size can be compared line by line.